VW Kaluga, Mechanical handling equipment Installation
Installation of mechanical handling equipment in continuous mode to “shuttle” in the areas BC, CC and UBS. New cells of robots were equipped with new engines, sensors, keyboards and safety equipment.
End client: Volkswagen Russia
Implementation was carried out in several stages: from December 2013 to November 2014
Activities:
• Material determination
• Electrical Construction Management
• Electric installations
• Production support
• Assemblers 16
Mercedes Benz Kecskemet, rebuilding process engineering and transport technology
• Transport conveyor technology, process technology, reconstruction and repair of cabins (SpotRepair)
• Transport conveyor technology, process technology, new modules VFT61 (SpotRepair) HRK supply
• Transport conveyor technology, extension of new modules VBH supply VFT11
• Cab-Sehon engineering process Mattlack
• Transport conveyor technology new modules VFT71 download SKD
Client: Mercedes Benz Hungary
Implementation was carried out in several stages: from October 2012 until December 2014
Activities:
• Material determination
• Electrical Construction Management
• Electric installations
• Assemblers 16
Porsche Leipzig, integration G2
Protection new cavity
End client: Porsche Leipzig
Implementation: June – December 2013
Activities:
• Material determination
• Electrical Construction Management
Expansion of transport conveyor systems 60 conveyors in eight areas of the facility
End client: Porsche Leipzig
Implementation: June – August 2014
Activities:
• Material determination
• Electrical Construction Management
• Electric installation
Mercedes Benz Kecskemet, de transport rebuilding process engineering and transport technology
Protection new cavity Process technique
New deposit high-bay, conveyor technology
End client: SVW China
Implementation: January – June 2012
Activities:
• Material determination
• Electrical Construction Management
New high-bay deposit with technical conveyor connection
End client: FAW China
Implementation: January – May 2013
Activities:
• Material determination
• Electrical Construction Management
Audi Bruxelles
New paint facility, total transportation systems i
End client: Audi Bruxelles
Implementation: since January 2015
Activities:
• Material determination
• Electrical Construction Management
• Electric installations
• Assemblers 16