Selected projects

VW Kaluga, Mechanical handling equipment Installation

Installation of mechanical handling equipment in continuous mode to “shuttle” in the areas BC, CC and UBS. New cells of robots were equipped with new engines, sensors, keyboards and safety equipment.

End client: Volkswagen Russia

Implementation was carried out in several stages: from December 2013 to November 2014

Activities:

• Material determination
• Electrical Construction Management
• Electric installations
• Production support
• Assemblers 16

Mercedes Benz Kecskemet, rebuilding process engineering and transport technology

• Transport conveyor technology, process technology, reconstruction and repair of cabins (SpotRepair)
• Transport conveyor technology, process technology, new modules VFT61 (SpotRepair) HRK supply
• Transport conveyor technology, extension of new modules VBH supply VFT11
• Cab-Sehon engineering process Mattlack
• Transport conveyor technology new modules VFT71 download SKD

Client: Mercedes Benz Hungary

Implementation was carried out in several stages: from October 2012 until December 2014

Activities:

• Material determination
• Electrical Construction Management
• Electric installations
• Assemblers 16

Porsche Leipzig, integration G2

Protection new cavity

End client: Porsche Leipzig

Implementation: June – December 2013

Activities:

• Material determination
• Electrical Construction Management

Expansion of transport conveyor systems 60 conveyors in eight areas of the facility

End client: Porsche Leipzig

Implementation: June – August 2014

Activities:

• Material determination
• Electrical Construction Management
• Electric installation

Mercedes Benz Kecskemet, de transport rebuilding process engineering and transport technology

Protection new cavity Process technique

New deposit high-bay, conveyor technology

End client: SVW China

Implementation: January – June 2012

Activities:

• Material determination
• Electrical Construction Management

New high-bay deposit with technical conveyor connection

End client: FAW China

Implementation: January – May 2013

Activities:

• Material determination
• Electrical Construction Management

Audi Bruxelles

New paint facility, total transportation systems i

End client: Audi Bruxelles

Implementation: since January 2015

Activities:

• Material determination
• Electrical Construction Management
• Electric installations
• Assemblers 16